The News of The Blake School Since 1916

The Spectrum

The News of The Blake School Since 1916

The Spectrum

The News of The Blake School Since 1916

The Spectrum

Minneapolis


  • 9 AM
    72 °
  • 10 AM
    75 °
  • 11 AM
    77 °
  • 12 PM
    78 °
  • 1 PM
    79 °
  • 2 PM
    79 °
  • 3 PM
    80 °
  • 4 PM
    81 °
  • 5 PM
    81 °
  • 6 PM
    78 °
  • 7 PM
    76 °
  • 8 PM
    74 °
  • 9 PM
    73 °
  • 10 PM
    72 °
  • 11 PM
    71 °
  • 12 AM
    69 °
  • 1 AM
    68 °
  • 2 AM
    67 °
  • 3 AM
    66 °
  • 4 AM
    65 °
  • 5 AM
    65 °
  • 6 AM
    65 °
  • 7 AM
    66 °
  • 8 AM
    68 °
  • 9 AM
    71 °
July 22
82°/ 64°
Patchy rain nearby
July 23
79°/ 64°
Moderate rain
July 24
79°/ 56°
Sunny

The effects of the construction sizzle for science

The+effects+of+the+construction+sizzle+for+science

With the construction under way, science teachers and students have been moved to new classrooms that may or may not be suited for science. Between the Cherne forum, NAR, various english and social studies rooms, and any miscellaneous spaces, classes have been squeezed into every nook and cranny of the building. But should AP chemistry students have to be mixing chemicals in Mr. Cawood’s room? Comment below or contact Spectrum another way with your thoughts on the construction’s level of disruptiveness.

Leave a Comment
More to Discover

Comments (0)

All The Spectrum Picks Reader Picks Sort: Newest

Your email address will not be published. Required fields are marked *